Van Ert Electric offers a single source solution for all your commercial electrical needs. From the high voltage distribution equipment needed in large institutional projects to the specialized low voltage voice/data/video systems required by many of our customers, we can meet your needs. We specialize in the Design/Build project delivery system which reduces the overall construction duration and helps our customers begin production and occupy space in the shortest time possible. Team coordination and information exchange are critical to the success of this method. The result reflects well-coordinated technical, construction and management expertise with the additional benefit of commencing construction before design documents are complete. Consideration of constructability issues, value engineering and alternative layouts minimizes schedule delays. Our in-house engineers, designers and technicians work from an existing set of criteria or develop criteria to deliver the highest quality installations on time and within budget.
American Express, Call Center, Green Bay, WI
150,000 square foot, two story office campus with data center, restaurant style cafeteria and health center.
Appleton Alliance Church, Appleton, WI
75,000 square foot school and church facility.
Dudley Tower, Wausau, WI
164,000 square foot, 11 story multi-tenant professional office building.
The Lodge at Cedar Creek, Rothschild, WI
150 room resort hotel, conference center and water park.
Wausau Window and Wall Systems, Wausau, WI
75,000 square foot office building and a 300,000 square foot manufacturing facility.